AL KUBRA Installation Of Aluminum and Glass L.L.CAL KUBRA Installation Of Aluminum and Glass L.L.CAL KUBRA Installation Of Aluminum and Glass L.L.C
+971 56 442 2112‬
alanan786@yahoo.com
Ajman - UAE
FAQ

Technical Expertise for Your Glazing Projects

Find answers to common questions about our aluminum and glass solutions engineered for UAE’s climate challenges. For complex inquiries, contact our specialists.

Our unitized systems are engineered for 3.5 kPa wind loads - exceeding Dubai Civil Defense requirements for high-rises. Each design undergoes CFD analysis for site-specific conditions.

We provide EI 60/90/120 certified fire-rated glass walls that maintain integrity at 1000°C for 60-120 minutes - fully compliant with Dubai Civil Defense regulations.

Timelines vary by scale:

  • Tower façades: 3-6 months
  • Commercial fronts: 4-8 weeks

We provide project-specific schedules after site assessment.

We integrate thermal-break aluminum profiles with low-E double/triple glazing (U-value ≤1.6 W/m²K), reducing cooling costs by 30-40% compared to conventional installations.

Yes! We retrofit manual systems with sensor-based automation (rain/wind sensors, app control) while maintaining structural integrity and safety certifications.

Our Ajman-based team manages all approvals:

  • Dubai Municipality (DM)
  • Dubai Civil Defense (DCD)
  • Ajman Development Authority including structural, thermal, and fire-safety certifications.

Our Other Business Enterprises